Is your estimating data ready for AI, or do you clean it up first?
You do not clean it up first. Getting the data ready is the first part of the work, and where your prices and rules live today sets the first step. In people's heads: write them down with your estimators. In Excel: build a codebook from the sheets you already bid from. Across HeavyBid, your accounting system, Outlook and SharePoint: connect what is there and leave each system in place. Coffer, which maps and levels vendor quotes to a heavy-civil contractor's material list, starts at whichever stage a firm is in.
By Declan · Reviewed
Where does your data live today?
In one of three places, and usually in more than one at once: in people's heads, in Excel, or across the systems the firm already runs. The fourth place is the one to build toward: every job on one set of data.
In people’s heads
Your chief estimatorDuctile fittings → 2640Carry the low vendorWe write your rules down with your estimators.
In Excel
Bid 27-104 FINAL.xlsxVendor prices.xlsx
We build your codebook from your sheets.
Across many systems


We connect what is there.
One system
Every job on one set of data.
Few firms sit on one stage. A contractor on HeavyBid has its codebook there, but its quotes arrive by email and are saved in bid folders, its POs are built in Excel, and some of its rules still live in people's heads. At one heavy-civil contractor on HeavyBid, which phase each material goes to on the PO was one of those rules. At a public works contractor that prices every bid in Excel, the unit prices live with the owner. So “ready” is not one state of the whole firm. Each kind of data has its own first step.
Why not clean it up first?
Because a cleanup with no bid to serve has no finish line, and it competes with the bids. The people who know the answers are the estimators, and in bid season they have no spare weeks.
It also gets the wrong answers. A codebook cleaned in a quiet month is set at the level of detail someone can describe, not the level the firm buys at, and the first buyout finds the difference. Rules written down in a meeting miss the exceptions that only show up on a live bid. Data gets right on the work that uses it: past bids first, then live ones, with each correction made where it shows up, by the person who knows the answer.
What if your prices and rules are in people's heads?
Write them down with your estimators, on real bids. Sit with the chief estimator over two or three finished bids and ask, for each material price that was carried, why. Each answer becomes a rule that someone else can follow and check:
- Which of your codes a supplier's item goes to:
Ductile fittings → 2640. - Which suppliers get the RFQ for each kind of material.
- When a plug is carried, and where the plug price comes from.
- How freight, tax and minimum charges are compared.
- Which phase or cost code the material goes to on the PO.
A rule in a head cannot be checked: no one can tell whether a carried price followed it. It also leaves with the person, as Should you hire another assistant estimator or hand off vendor quote entry? describes.
What if they are in Excel?
Build a codebook from the sheets you already bid from. A codebook is one row for each material you buy: your code, a description written the way a supplier prints it, the unit, a plug price, and the suppliers who quote it. Most of it is already in your files.
- Take three to five finished bids across your scopes, with the vendor quotes that came back and the prices you carried.
- Pull every material row from those sheets into one list.
- Merge the rows that are the same item written differently.
8-IN DIP CL52 PUSH-ON,8" DUCTILE IRON PIPE CL 52 PUSH ONandDIP 8 CL52 P/Oare one material, so they get one code. - Set each code at the level you buy: its own code when a supplier prices it on its own line, when it can come from a different vendor, or when it goes on a different PO. How to decide is in How detailed should your material resource codes be for vendor quotes?
- Keep the last quoted price on each row, with the vendor and the date, so every plug has a source.
What if it is spread across HeavyBid, CMiC, Outlook and SharePoint?
Connect what is there, and leave each system in place. Follow one material price through a typical HeavyBid firm and it passes through five places:
- The vendor's quote arrives in one estimator's Outlook.
- It is saved to the bid's quote folder on SharePoint.
- Its prices are typed into HeavyBid. As one estimating team put it, a quote is stored in HeavyBid only “when we type it in.”
- After award, the PO is built in Excel from the quote the team chose.
- Accounting enters the PO in CMiC or another accounting system, and the vendor's invoice is filed against it there.
Each system holds its part, and none holds the quote line, the carried price, the PO line and the invoice together. Connecting them means reading each one where it lives:
| System | What it holds | How it is read |
|---|---|---|
| HeavyBid desktop | The codebook, estimates, quote folders and the prices carried | Through HCSS's API, from what each estimate has synced to Estimate History, so Estimate History is turned on first. The copy online is only as current as the last sync. Prices go back in through Import Quote Prices from an Excel file (HeavyBid 2024.1 and later), one vendor at a time. |
| CMiC | POs, vendor invoices and job cost | Through CMiC's REST API, which returns each PO's lines with the item, the ordered quantity and the expected unit price. |
| Outlook and SharePoint | Vendor quotes, RFQs and POs as sent; bid folders and price letters | Through Microsoft 365, once your administrator consents for the firm. |
| A system with no API | Whatever it holds | An export, or the files uploaded. |
Ask for access in the first week, because it takes the longest: an administrator has to create the HeavyBid API client, turn on Estimate History and grant the Microsoft 365 consent. Do not wait for it. The first bids can run on files: the quote folder as it is, and the estimate exported to Excel.
What does one system mean?
Every job on one set of data. The material list, each vendor's quote line, the price you carried, the PO line and the invoice line are tied to each other, so each question has one place to look: which vendor quoted this, why this price was carried, and whether this invoice is above its PO.
It does not mean replacing HeavyBid or your accounting system. They stay where they are, and the record that ties them together is the new part. It stays yours: your data and what Coffer learns about your firm export whenever you need.
What should you gather for the first week?
The same files start the work at every stage:
- Three to five finished bids across your scopes, each with its whole quote folder and the prices you carried.
- Read access to the place your quotes live, not one folder at a time.
- Standing price lists and agreements: annual aggregate, ready-mix, precast and RCP price lists, rate-increase letters and trucking agreements.
- One RFQ as it was sent and one PO as it was issued, filled in, not the blank forms.
- The person who administers your estimating system and Microsoft 365, in the first working session.
- The names of everyone who touches quotes, not only the estimators.
- The live bids due in the next two or three weeks.
How does Coffer handle this?
Coffer (coffer.build) runs the material side of estimating and project controls for heavy-civil contractors. It maps and levels vendor quotes to the firm's material list, recommends a carry on every row, cuts the POs and checks invoices against them. The estimator makes the final carry decision.
Every deployment starts by getting the data ready at the stage the firm is in: the rules written down with the estimators, the codebook built from the sheets, or the systems connected. A deployment takes about three weeks, and it runs on the firm's past bids first and then its live ones. Your team makes the calls, and each correction is kept, so the next bid needs less of their time.
Send one finished bid, with its material list, the vendor quotes that came back and the prices you carried, to declan@coffer.build, or use the contact form below. You get the mapped, leveled comparison back, and we tell you which stage your data is in.
Sources
Public references checked Nov 23, 2026.
- HCSS, How to Enable Estimate History
- HCSS, HeavyBid Desktop Customers: The Web Features You Can Use Today (webinar and transcript) (recorded Aug 20, 2026)
- HCSS, HeavyBid: Adding a Web Subscription and Importing Your Setups (webinar and transcript) (recorded Sep 17, 2026)
- HCSS, How to Import Quote Prices from Excel
- CMiC, Get Purchase Order Detail Lines (API documentation)
- Microsoft, Grant tenant-wide admin consent to an application
- Coffer field note, How detailed should your material resource codes be for vendor quotes? (Nov 22, 2026)
- Coffer field note, Should you hire another assistant estimator or hand off vendor quote entry? (Oct 14, 2026)