How can AI put Core & Main or Ferguson Waterworks quotes into your bid sheet?

Read the supplier quote as printed, match its lines to your material list, and compare at your quantities and units. Keep source pages, gaps, alternates and quote-level charges visible. Coffer does the reading, matching and leveling as a service; your estimator makes the final carry decision.

What needs to move from the quote?

A Core & Main or Ferguson Waterworks quote needs more than a column of prices copied into Excel. Each supplier line needs a destination on your material list, a compatible unit and its source page. Freight, quote dates, exclusions and pricing conditions need to survive the transfer too. Layouts vary by quote; neither supplier has one universal format to assume.

Keep two tables: the supplier's lines as printed and your material list with the proposed matches. That lets you correct a match without losing what the supplier actually quoted.

What should the bid sheet show?

The following is an illustrative example, not a quote from either supplier. Its prices and codes are invented. The quote explicitly states 20 feet per joint.

Your rowSupplier lineBid-sheet result
P100 · 600 LF of 8-in C900 DR18 pipe30 joints · $800 per 20-ft joint$40/LF × 600 LF = $24,000. Keep the 20-ft basis with the match.
V100 · 2 EA 8-in MJ gate valves2 EA 8-in flanged gate valvesReview the connection difference. Do not carry it as an exact match.
R100 · 4 EA restraint glandsNo corresponding quote lineNot quoted. Keep any plug separate from supplier pricing.
Freight$350 per shipmentA separate quoted charge. Confirm the shipment count before comparing totals.

A supplier item number identifies that supplier's product. It does not replace the size, material, class, end connections and function needed to establish that it belongs on your row. For that matching method, see mapping a waterworks quote to your material list.

What should the AI extract, and what should the estimator decide?

  1. Read every printed line, quantity, unit, unit price and extension. Keep terms and quote-level charges outside the material unit prices.
  2. Match each line to your list. Keep unmatched lines and list rows with no quote.
  3. Convert units only from a stated basis. Price your quantities, not the supplier's assumed quantities, when leveling vendors.
  4. Reconcile extracted extensions against the printed subtotal. A correct subtotal alone does not prove the lines mapped to the right products.
  5. Review substitutions, gaps, quantity differences and terms before the carry.

AI can propose the reading and matches. The estimator decides whether an alternate meets the scope and which price to carry. Do not let a completed table turn an unquoted item into a supplier commitment.

How does Coffer handle this?

Coffer maps supplier quote PDFs to your material list, shows the source behind the matches and levels the vendors at your quantities. It recommends a carry; your estimator makes the final decision. The managed service fits the comparison and HeavyBid handoff to your workflow.

Try mapping a material list and quote, then inspect the matches against your own PDF. For the ongoing service, see features and pricing.

Sources

Public references checked Nov 1, 2026.

  1. Core & Main, Pipe, Valves & Fittings
  2. Coffer field note, Matching a waterworks quote to your material list

A self-perform civil contractor is moving into deployment after seeing Coffer on their own bids.

See Coffer on your own quotes.

We'll show you Coffer on your own quotes within a week.

Prefer email? declan@coffer.build · Privacy · Coffer in Claude

Build in the dry.